Skip to main content


Construction of Craigflower Bridge

Capital Works Project Guidelines for 2015

The Engineering Department has created a 2015 Capital Works Project Guide that showcases infrastructure projects planned for the year. The Guide provides descriptions and background information for transportation, sanitary sewer, storm drain, water works, and construction projects in Saanich. For more information, download the Saanich Engineering Department’s 2015 Capital Works Project Guide.  

Craigflower Bridge nearing completion

Current Projects

The Cook Street Complete Streets project is now complete.

Engineering Specifications

Engineering Specifications applies to the design and installation of sanitary sewers, storm drains, waterworks, roadways, sidewalks, and other works and services.

Local Area Services

A Local Area Service allows for the installation of a service that directly benefits a distinct area of Saanich, and to have the service paid for in whole or in part by those who directly benefit.

Sewer, Drain & Water Connections

Do you need an upgrade to your sewer, drain or water connection?

Boulevard Use

Boulevards are the lands within a road allowance that are not used for the travelled portion of the road or for sidewalks.

Last modified: October 01, 2014