Skip to main content

Engineering

Construction of Craigflower Bridge

Engineering Specifications

Engineering Specifications, applies to the design and installation of sanitary sewers, storm drains, waterworks, roadways, sidewalks, and other works and services.

Craigflower Bridge nearing completion

Current Projects

Construction on "Cook Street Complete Streets" project begins on Monday, August 25, 2014 to approximately May, 2015. Cook Street will be closed except for local traffic.

Local Area Services

Creation of a Local Area Service allows for the installation of a service that directly benefits a distinct area of Saanich, and to have the service paid for in whole or in part by those who directly benefit.

Boulevard Use

Boulevards are the lands within a road allowance that are not used for the travelled portion of the road or for sidewalks.

Last modified: August 19, 2014