On October 5, 2020 Council adopted the regulatory framework to allow Garden Suites in Saanich. It is now legal to construct a garden suite with a permit on most single family residential (RS-zoned) properties inside the Sewer Service Area.
Visit Saanich.ca/gardensuites to find out if your property is eligible for a garden suite, and learn more about the regulations and application process.
One Year Garden Suite Update
On May 9, 2022 Council received a report with a one-year review of the garden suite program. In total, 67 garden suite development permit applications were received in the first year. Minor changes to regulations were endorsed by Council and bylaw amendments will be considered by Council shortly. As part of future monitoring, a two-year report will also be completed.
Bylaw Amendments to Permit Garden Suites Forwarded to Public Hearing
On August 17, 2020, Council gave First Reading and forwarded the following bylaw amendments to a Public Hearing:
- Zoning Bylaw, 2003, Amendment Bylaw, 2020, No. 9647 to permit garden suites on RS-zoned properties; and
- Official Community Plan Bylaw 2008, Amendment Bylaw, 2020, No. 9648 to create a Development Permit Area for garden suites.
The Public Hearing is scheduled for Tuesday, September 15, 2020 at 7 pm.
The proposed bylaw amendments would enable garden suites as a permitted use in residential areas. The proposed amendments are based on the regulatory framework that was endorsed by Council on October 21, 2019.
Providing Input to Council
You are invited to provide input to Council on the proposed bylaw amendments as part of the Public Hearing. Please note that due to COVID-19 our typical procedures for input have been modified. For more information see the Agenda for the Public Hearing.
Next Steps
Final approval to adopt the bylaw amendments would be made at the Public Hearing. If granted, the adoption of the bylaw amendments would legalize garden suites and allow residents to apply for permits.
August 17, 2020 Council Report
The Council report and attachments, including all proposed bylaw amendments are available here:
- Council Report (August 2020) [PDF - 302 KB]
- Attachment A - Zoning Bylaw Amendment Bylaw, 2020, No. 9647 [PDF - 804 KB]
- Attachment B - Official Community Plan Bylaw, 2008, Amendment Bylaw 2020 No. 9648 [PDF - 33 MB]
- Attachment C - Delegation Authorization Bylaw (Development Permits), 2020, No. 9649 [PDF - 131 KB]
- Attachment D - Land Use and Development Procedures Bylaw, 2020, No. 9650 [PDF - 167 KB]
- Attachment E - Land Use and Development Application Fee Bylaw, 2006, Amendment Bylaw, 2020, No. 9651 [PDF - 7 KB]
- Attachment F - Amendments to the Terms of Reference for the Advisory Design Panel [PDF - 128 KB]
- Attachment G - Council report presented to Council on October 21, 2019 [PDF - 128 KB]
- Supplemental Council Report (August 2020) [PDF - 10 MB]
Highlights of Proposed Regulations
The proposed regulations are based on community input and include requirements for the location, size and height of garden suites, as well as aspects of building design such as roof form, windows, lighting and landscaping.
Details of the proposed regulations for garden suites are included in the Virtual Open House display boards.
Highlights of the proposed regulations include:
- Garden suites would be permitted on all RS zoned lots inside the Sewer Service Area, subject to regulatory requirements
- Garden suites would be permitted as an alternative to secondary suites (not both on the same property)
- Garden suites would be permitted in the rear yard, with the potential for variances to consider other locations on the lot
- Garden suites would be regulated based on three lot size categories:
- Small lots (400 – 559 m2)
- Medium Lots (560 – 999 m2)
- Large Lots (1000 m2 +)
- The maximum garden suite size permitted would be 46.5 m2 (500 ft2) on a small lot, 65 m2 (700 ft2) on a medium lot and 93 m2 (1000 ft2) on a large lot
- The size of garden suites and other structures would also be limited by maximum lot coverage and setback regulations
- Garden suite height limits would allow smaller buildings on small and medium lots and larger buildings on large lots
- Owner occupation in the primary dwelling or garden suite would be required
- Design guidelines [PDF - 33 MB] would guide building and site design
Revised accessory building regulations are also being proposed that align with the proposed regulations for garden suites. The proposed regulations for accessory buildings seek to limit their size and prohibit their use as dwellings.
Regulatory Framework
A proposed regulatory framework for garden suites was endorsed by Council on Monday, October 21, 2019. Formal bylaw amendments have been drafted based on this framework.
- Council Report (October 2019) [PDF - 2 MB]
- Attachment A: Proposed Zoning Regulations [PDF - 856 KB]
- Attachment B: Proposed Design Guidelines [PDF - 4 MB]
- Attachment C: Proposed Changes to the Regulations for Accessory Buildings [PDF - 29 KB]
- Attachment D: Garden Suite Study Terms of Reference [PDF - 932 KB]
- Attachment E: Summary of Public Engagement [PDF - 106 KB]
- Attachment F: Summary of Survey Results for Community Survey #3 [PDF - 14 MB]
- Attachment G: Policy Framework for Garden Suites [PDF - 134 KB]
Stay informed!
Register to our notification list for updates. You will receive updates by email when there are opportunities for public input or when this subject will be considered by Council.
Project timeline
We are now in Phase 5 - the final phase of the Garden Suite Study. Council endorsed the proposed regulatory framework on October 21, 2019. Staff are now working to prepare the formal bylaw amendments. Readings by Council and a Public Hearing will be scheduled in the future.
Phase 4, in which the proposed regulations were released for public review, is complete.
In Phase 3 we continued the exploration of ideas and issues for potential regulations for garden suites that was started in Phase 2. We received 711 responses to Community Survey #2 and we talked to over 150 people at information displays set up at three music-in-the-park events in July.
Phase 2 marked the beginning of our engagement with the public and stakeholders to learn more about their interests and concerns, and to test different ideas for potential regulations for garden suites. We hosted two open houses and six pop-up and information displays. We also launched two surveys and received a total of 1,964 survey responses.
We initiated the project in Phase 1. Staff worked behind the scenes to complete background research to inform discussions about garden suites in Saanich.
Background
A garden suites is a detached house that is in the rear yard of a single family lot. It is accessory to the primary dwelling. Garden suites are also known as backyard cottages, laneway houses, carriage houses, coach houses, accessory dwelling units, secondary dwelling units, and detached accessory dwelling units.
Garden suites are currently not permitted in Saanich. However, there has been growing community interest in having a garden suite to help offset a mortgage with rental income, house a family member, or provide an accessible living situation.
On September 11, 2017, Council adopted a Terms of Reference for a study to explore potential regulatory changes to permit garden suites. The study will take approximately 12 months to complete and will involve lots of opportunities for public input.
Documents and reports
Open houses (May 2019)
Council Reports
- Council Report (October 2019) [PDF - 2 MB]
- Attachment A: Proposed Zoning Regulations [PDF - 856 KB]
- Attachment B: Proposed Design Guidelines [PDF - 4 MB]
- Attachment C: Proposed Changes to the Regulations for Accessory Buildings [PDF - 29 KB]
- Attachment D: Garden Suite Study Terms of Reference [PDF - 932 KB]
- Attachment E: Summary of Public Engagement [PDF - 106 KB]
- Attachment F: Summary of Survey Results for Community Survey #3 [PDF - 14 MB]
- Attachment G: Policy Framework for Garden Suites [PDF - 134 KB]
- Council Report (December 2018) [PDF - 2 MB]
Public Engagement
- Community Survey #3 Results and Appendix A [PDF - 2 MB]
- Appendix B - Community Survey #3 Survey Tool [PDF - 2 MB]
- Appendix C - Community Survey #3 Written Comments [PDF - 787 KB]
- Phase 2 - Summary of Public Engagement and Survey Results (March - August 2018) [PDF - 1 MB]
- Community Survey #1 and Open House Results (March - April 2018) [PDF - 3 MB]
- Community Survey #2 Results (June - August 2018) [PDF - 2 MB]
- Public Opinion Survey for Garden Suites in Saanich Results (June - July 2018) [PDF - 3 MB]
Open houses (March 2018)
Other documents
- Garden Suite FAQ
- Garden Suite Study Terms of Reference
- Garden Suite Study Staff Report
- Garden Suite Study Engagement Strategy
Garden Suite Regulatory Changes are Moving Forward