Beckwith Park Dam Decommissioning

Project Update (Sept 2023)

We have received approval from the Province to do the further investigative work, which is tentatively scheduled for September 12. Crews will be onsite with Environmental Consultants and Geotechnical Engineers. This investigative work is to determine the spillway level should a partial decommissioning of the dam be approved.

No further work on the dam will be done this fall/winter.

Project Update (July 2023)

Work on the decommissioning of the Beckwith main dam continues with the Province and we hope to be doing further investigative work in August. Through the feedback we have received to date, keeping the water level as high as possible is the main concern and this work will help determine the final elevation of the spillway and the maximum water level of the pond.

 At this stage of the investigation, should a partial decommissioning of the dam be approved, construction would likely be during the summer of 2024.

Project Update Update (March 29, 2023)

On Tuesday February 7, 2003, Saanich Parks together with Don Mann Excavating hosted a Public Open House and presented information about the decommissioning project for the dam at Beckwith Park.

Thank you to all who took the time to complete the feedback questionnaire. The results of the feedback questionnaire are available here. [PDF - 497 KB]

To better understand the Partial Decommissioning option and minimize the reduction in water level, Don Mann Excavating, monitored by Aqua-Tex Scientific, Ryzuk Engineering, with assistance from Saanich Parks will be on-site at the end of May (weather dependant) to excavate a test hole on the main dam to accurately determine the elevation of the native soil. This investigation will establish the final grade of the spillway to meet provincial regulations governing the decommissioning of the dam.

Project Update Update (March 1, 2023)

On Tuesday February 7, 2003, Saanich Parks together with Don Mann Excavating hosted a Public Open House and presented information about the decommissioning project for the dam at Beckwith Park.

Thank you to all who took the time to complete the feedback questionnaire. The results of the feedback questionnaire will be posted here soon.

Water Licence Removal

Picture of Beckwith Park pond with trees surrounding it showing area of dam decommissioning

Beckwith Pond is a constructed landscape feature formerly used by farmers in the area as an irrigation pond. The licence was attached to an adjacent property by the Province, and that property is now owned by Don Mann Excavating Ltd. 

The primary objective of the Beckwith Pond Dam Decommissioning Project is to separate the water licence and its duties and responsibilities from the adjacent property and assign those to the Beckwith Park property (i.e., to the District of Saanich): the Provincial Dam Safety Office Under the Water Sustainability Act and Dam Safety Regulation administers the licensing, maintenance and decommissioning requirements for the licence in question.

Beckwith Pond Dam decommissioning and associated ecological restoration work as proposed by Don Mann Excavating Ltd. is required prior to discharge of their water licence to mitigate risk. The project is expected to have significant environmental benefits to the Beckwith Park landscape with only minor disruptions to public use of the park. Don Mann Excavating Ltd. would like to start the project, pending Provincial permits and the results of ongoing public consultation. 

Dam Decommissioning

The decommissioning of dams in the Province is administered by Dam Safety Officers and the B.C. Dam Safety Program works to reduce risks associated with the design, construction, operation, maintenance, removal and/or decommissioning of a dam. The decommissioning of the Beckwith Pond dam structure is a prerequisite for removal of the water licence. This also means the owners of the water licence are responsible for dam decommissioning even though the dam is located in Beckwith Park. The dam decommissioning plan has been reviewed by a provincial Dam Safety Officer and is compliant with requirements of the provincial Water Sustainability Act and Dam Safety Regulation.

Retention of Beckwith Park Amenities

The continuous looped path around the Beckwith Pond takes advantage of the dam structure on the eastern edge and pathways that lead off into adjacent neighbourhoods connect to the looped trail, making it a popular neighbourhood walking route. A key outcome of this project is to retain the loop trail and its connections, as such, the required breach in the dam will see pedestrian bridge approximately 10m in length.
Mock of new pedestrian bridge proposed for Beckwith Park loop trail

Wildlife Habitat Enhancements

As a result of the breach in the dam, several habitat enhancements will be realized at the new bridge site.

New Stream Channel

The removal of an approximately 10m wide section of the dam (i.e., the breach) will allow the construction of a new stream channel designed to take the overflow from the pond and direct it safely into the Beckwith Creek.

Questions or comments?

 Contact us at parks@saanich.ca or 250-475-5522.